Skip to main content

Proven infrastructure (Phase 4)

Closes the remaining P2 items from the v0.3 foundation epic:

IssueDeliverable
#14../../benchmarks/ harness + published baseline template
#15Chaos / HA qualification + crate tests
#16../../scripts/upgrade-rollback.sh N→N+1 contract
#17Compatibility matrix + SLOs

These documents record what is measured in-tree versus what still requires a live FluxVM lab. They do not reintroduce the fictional etcd-cluster / memory-live-migration claims removed in 0.2.0.