Readiness
Purpose
Migration Readiness — pre-flight checks that verify the environment is in a good state before you start a migration, with a pass/fail summary and per-check detail.
Run this before large Migration Wizard / batch work so failures are environmental, not mid-job surprises.
When to use it
- Before starting migrations, to verify host/environment readiness
- To read per-check pass/fail detail when the summary is not all green
- Prefer this page when the job matches the purpose above
- After fixing storage/network/FluxVM issues, to re-validate before retry
How to get there
- Route / id:
/migration-readiness - Nav: More — images, migrations & managers → Readiness (sidebar, command palette, or desktop nav)
Operate from the console (UX)
- Open Readiness and run/load the pre-flight check set.
- Read the pass/fail summary first.
- Expand or scan per-check detail for anything failing.
- Remediate owning systems (storage space, FluxVM health, network reachability to remote sources).
- Re-run checks until the summary is clean, then proceed to Migration Wizard / Batch Migration.
Typical flow: Readiness → fix fails → Readiness again → Migration Wizard → Pipeline/History. Dashboard capability chips should already be Live before you trust a green readiness result.
Empty / fail: Error banner, empty table, or failed toast — confirm you are signed in, zyvor-fabricd is healthy (/readyz on http://127.0.0.1:<port> or https://<host>), and any backend this page needs (FluxVM, storage, network) is reachable. See Admin basics.
Success: Live data loads without error; creates/updates appear in the list or detail view and any confirmation toast clears cleanly.